Protection&Control Transmission Line Protection Busbar Protection Transformer Protection Circuit Breaker Protection Generator Protection Feeder Protection Capacitor Protection Motor Protection Transfer & Synchronization Arc Protection
Digital Substation PCS-221S Merging Unit PCS-221 Merging Unit PCS-222 Circuit Breaker Controller PCS-9250 AC Electronic CT/VT
Automation PCS-9700 Automation System PCS-9700 HMI Software PCS-9705 Bay Control Unit PCS-9705S Bay Control Unit PCS-9799 Station Manager PCS-9799S Station Manager PCS-9710 Remote Terminal Unit PCS-9710S Remote Terminal Unit PCS-9794 Protocol Converter PCS-9785 Satellite-Synchronized Clock PCS-9882 Ethernet Switch PCS-9882Rx DIN Rail Managed Ethernet Switch PCS-9882XD Managed Ethernet Switch PCS-9884 Managed Ethernet Switch Supporting HSR and PRP MUX-2M/64 Communication Interface
Phasor Measurement PCS-997S Fault Line Locator PCS-996S-G Phasor Data Concentrator PCS-996 Phasor Measurement Unit
Disturbance Fault Recording PCS-996RC Disturbance Fault Recorder PCS-996R Disturbance Fault Recorder PCS-986 Disturbance Fault Recorder PCS-9013 DFR Management System
Stability Control System PCS-992 Power Stability Control System PCS-993 Out-of-Step Controller PCS-994 Frequency & Voltage Controller PCS-994S Frequency and Voltage Controller
Power Grid Monitoring and Control PCS-9000 Energy Management System PCS-9000 Distribution Management System
Configuration Tool PCS-Torch MOT Tool PCS-Studio Configuration Tool PCS-Explorer IED Configuration & Debugging Tool PCS-SCD Configuration Tool PCS-COMM Configuration & Debugging Tool
Accessories MD1501 Series Auxiliary Relays MD1701 Series Test Blocks MD1701S Test Block
FACTS PCS-9580 Static Var Compensator PCS-9583 Static Synchronous Compensator PCS-9570 Series Compensation PCS-9590 DC De-Icer PCS-9578 Controllable Shunt Reactor PCS-8200 Unified Power Flow Controller PCS-9571 Fault Current Limiter PCS-9564A Dynamic Voltage Restorer PCS-9569 Shore Power System
HVDC PCS-8600 UHVDC Converter Valve System PCS-9550 LCC-HVDC Control and Protection System PCS-8100 VSC-HVDC IGBT Valve PCS-9520 VSC-HVDC Control and Protection System PCS-9510 Cooling System PCS-8300 High-voltage DC Circuit Breaker PCS-9250 DC Electronic CT/VT
PV & Wind Power Grid-Connection PCS-9700 Renewable Energy SCADA PCS-9726 Generation Management Unit PCS-9700F Power Forecast System PCS-9700R AGC/AVC
Battery Energy Storage System PCS-9567TU-1000/1250/1375/1575/1750 1500V Series Outdoor Power Conversion System PCS-8811CB Centralized energy storage system PCS-8812PB Liquid cooled energy storage cabinet PCS-8813CPB High voltage directly connected energy storage system PCS-9567A Power Conversion System PCS-9567C BESS Control Unit PCS-9700 Energy Storage System
Microgrid PCS-9617MG Microgrid Controller
Static Frequency Converter PCS-9575 Static Frequency Converter
Protection,Automation&Control DMS EMS Stability Control & WAMS Digital Substation
HVDC & FACTS De-Icing Unified Power Flow Controller (UPFC) Series Compensation Static Synchronous Compensator(STATCOM) Static Var Compensator (SVC) LCC-HVDC Transmission VSC-HVDC Transmission
Renewable & Microgrid Energy Storage System Microgrid PV Generation SFC
Power Generation Pumped Storage Power Plant Nuclear Power Plant Hydro Power Plant Thermal Power Plant
Transmission System AC Transmission LCC-HVDC Transmission VSC-HVDC Transmission
Distribution System Distribution Network
Industrial Consumer Urban Track Traffic Electrified Railway Oil & Petrochemical Metals & Mining
On October 29, 2021, after more than 50 hours of continuous test, the DC de-icing equipment of 500kV Tianxing intelligent substation successfully completed the current raising operation with the line. NR has added another high-capacity DC de-icier in China Southern Power Grid.
Tianxing substation is the second 500kV smart station of Yunnan power grid. It was put into operation in July 2021. The rated capacity of the de-icing equipment is 103MW and the rated output DC current is 5000A, which can meet the DC de-icing requirements of 500kV Tianxi line A and B.
After on-site installation and commissioning, NR service team has completed various acceptance works. On October 27, it was officially started and put into operation. After two days and two nights of live test, the 5000A short-circuit current rise of the de-icing system was realized without abnormality, and the current rise of the de-icing system with 500kV line conductor and ground wire was realized. The smooth operation indicates that the DC de-icing of Tianxing substation has the ability of emergency de-icing to protectpower supply in winter.
Field test of DC de-icing of Tianxing substation
DC de-icing converter valve of Tianxing substation
At present, NR has successively put into operation more than 80 sets of DC de-icing equipment in various regions of the country to escort the stable and reliable operation of the power grid.
NR will always create value and serve the society with professional skills and high-quality and reliable services to ensure the normal operation of power grid in snow season.